Your location:  Home  >  Bearing News  >  World Bearing News
<<  Back

GE Renewable Energy Begins Shipping Its First Offshore Wind Turbine Nacelles to the United States

Resource from:  GE Renewable Energy Likes:263
Jul 14,2016
The GE Renewable Energy offshore wind turbine plant in Saint-Nazaire (France) is completing the manufacturing of its first commercial series of Haliade Offshore wind turbine nacelles. The five 370-ton nacelles are scheduled to begin their voyage to the United States in the coming days. They will equip the Block Island Wind Farm, the first of its kind in the U.S. The Block Island project is situated off the coast of Block Island, Rhode Island on the East Coast of the United States. The Haliade turbines, ordered by Deepwater Wind, will be installed starting in August. With a total capacity of 30 MW, the Block Island Wind Farm will produce 125,000 MWh of electricity per year, enough to supply electric power to 17,000 households. It will be connected to the grid by the end of 2016. “This marks a milestone for the company and we are proud to contribute to the Block Island project, the first offshore wind farm in the United States. This demonstrates our readiness to respond to expanding international demand. We are well positioned to become a major player in offshore wind energy, and to lead in the energy transition across the world,” said Anders Soe-Jensen, CEO of GE Renewable Energy’s Offshore Wind unit. “We’re proud that America’s first offshore wind farm will feature, in GE’s Haliade turbine, some of the world’s most innovative offshore wind technology,” said Deepwater Wind CEO Jeffrey Grybowski. The industrial site at Saint-Nazaire, inaugurated in December 2014, was designed to produce up to 100 turbines per year. The Saint-Nazaire plant will also be the assembly site for 66 wind turbines intended for the Merkur wind farm in Germany, followed by the 238 turbines slated to equip the three French wind farms in Saint-Nazaire, Courseulles-sur-Mer and Fécamp, installed by EDF Energies Nouvelles. The Haliade turbine was specifically designed for a marine environment. Thanks to its 150-metre blades, its output is 15% higher than the offshore turbines of the same generation. Producing 6 MW of power, it is capable of supplying the equivalent of 5,000 households per year, with annual CO2 savings of more than 21,000 tonnes. At a total height of 170 metres, the Haliade is almost twice as tall as the Statue of Liberty. Its blade, which measures 150 metres in diameter, is comparable to twice the wingspan of an airbus. Its outsized blades cover a surface area of 17,860 m2, three times the area of a football field.
(GE Renewable Energy)
【CBCC News Statement】
1.The news above mentioned with detailed source are from internet.We are trying our best to assure they are accurate ,timely and safe so as to let bearing users and sellers read more related info.However, it doesn't mean we agree with any point of view referred in above contents and we are not responsible for the authenticity. If you want to publish the news,please note the source and you will be legally responsible for the news published.
2.All news edited and translated by us are specially noted the source"CBCC".
3.For investors,please be cautious for all news.We don't bear any damage brought by late and inaccurate news.
4.If the news we published involves copyright of yours,just let us know.

BRIEF INTRODUCTION

Cnbearing is the No.1 bearing inquiry system and information service in China, dedicated to helping all bearing users and sellers throughout the world.

Cnbearing is supported by China National Bearing Industry Association, whose operation online is charged by China Bearing Unisun Tech. Co., Ltd.

China Bearing Unisun Tech. Co., Ltd owns all the rights. Since 2000, over 3,000 companies have been registered and enjoyed the company' s complete skillful service, which ranking many aspects in bearing industry at home and abroad with the most authority practical devices in China.